Newman Springs Pump Station Twin 24" Discharge Main Rehab


PROJECT details

Client: New Jersey American Water

Location: Red Bank, NJ

Capabilities: Rehabilitation, Replacement, Design Build

Services: CIPP, CCTV & Cleaning

  • The project required the CIPP lining of twin - 24” water lines with a class 4 structural liner designed for an operating pressure of 120psi and a test pressure of 150psi. Each line was approximately 700’ long, having several elbows and offset joints.

 
 

Previous
Previous

Mentone Pipeline

Next
Next

North Outfall Sewer Maze Rehab Phase V