PROJECT details

Client: Jersey City Municipal Utilities Authority (JCMUA)

Location: Jersey City, NJ

Capabilities: Rehabilitation, Replacement, Emergency Services, Value Engineering / Design Build

Services: Bypass Pumping, LSLR, CIPP, Geopolymer, CCTV & Cleaning

  • The part of the JCMUA project included cured-in-place pipe (CIPP) lining of approximately 8,750 linear feet of combined sewer, the guniting of approximately 10,000 square yards of combined sewer, and the replacement of approximately 32,855 linear feet of combined sewer throughout the City of Jersey City, including associated sewer cleaning, internal television inspection, maintenance of sewage flows, traffic control, utility relocation, and other appurtenant work. The existing combined sewers in this project consisted of 12” through 136”x87” pipes and sewer chambers. The existing pipe materials include VCP, PVC, RCP, DIP, Brick, and concrete chambers. The work also included manhole rehabilitation and replacement, catch basin replacement, and water main and other utility infrastructure relocation as needed and directed. The project also included approximately 34,055 linear feet of water main relocations and replacements.

    Some challenges we faced were the high profile areas that our work was located in and ensuring homeowner communication was accurate and consistent.

 
 

Previous
Previous

Trenton Lead Service Replacement Projects

Next
Next

JCMUA Phase 3 & 4